This file lists the item number and a descriptive title of each of the l documents related to the clean up of the former Henry Wood's Sons Company/Paintshop Pond site to be found in the Science Library. The full Excel spreadsheet also contains the document date, subject category and type.If you have problems downloading the Excel Spreadsheets, please see the Directions for Launching Excel.

All items in this list are available in the Reserve Collection located at the Science Library Circulation Desk. Ask for the "Paintshop Pond Documents" and use the "Item #" in the first column to request the papers that you want to see.

Documents related to Clean-Up of former
Henry Wood's Sons Company Paint Factory/Paintshop Pond Site

Item #

Title or Description

B1

Report of Phase I Sampling and Analysis on the Former Paint Factory Site

B2

Report of Phase II Assessment of the Former Henry Wood's Sons

B3

Proposed Scope of Work Supplemental Sampling Program and Public Health and Environmental Risk Assessment Paint Factory Site, Wellesley, MA

B4

Request for Determination of Applicability, Former Henry Wood's Sons and Company Paint Factory Site

B5

A Limited Diagnostic Survey of the Wellesley College Campus to Detect the Potential Presence of Paint Pigments Originating From the Former Paint Factory Site at Paintshop Pond

B6

Addendum Report: Phase II Assessment of the Former Henry Wood's Sons and Company Paint Factory Site

B7

Proposed Scope of Work Hydrogeologic Assessment East of the Former Henry Wood's Sons Company Paint Factory, Wellesley, MA

B8

Request for Determination of Applicability, Former Henry Wood's Sons and Company Paint Factory Site

B9

Summary of The Phase I Activities, Wellesley College Campus, Wellesley, MA

B10

Interim Measures Plan for the Removal of Source Material at the Former Henry Wood's Sons and Company Paint Factory Site

B10a

Fact Sheet on Paintshop Pond issued by Wellesley College Office of Public Affairs

B11

Contract Documents and Specifications for Source Remediation Activities at the Former Henry Wood's Sons and Company Paint Factory Site , revised September 7, 1991

B12

Supplemental Report to the Phase II Assessment of the Former Henry Wood's Sons and Company Paint Factory Site

B13

Paintshop Pond - Addendum to Phase II, DEP Case #3-0462, Response to DEP Comments and Questions

B14

Waiver Application Paintshop Pond, Route 135

B15

Scope of Work: Supplemental Environmental Monitoring Program Former Henry Wood's Sons and Company Paint Factory Site, Wellesley, MA

B16

Interpretive Report of Results for the Groundwater Sampling Survey, Fall 1994

B17

Strategy Document for the Management of Contaminated Media Former Henry Wood's Sons and Company Paint Factory Site, Wellesley, MA

B18

Immediate Response Action Plan, Paint Factory Site, Wellesley, MA

B19

Request for Determination of Applicability, Implementation of Access Control Measures, Former Paint Factory Site

B20

Interpretive Report of Results for the Groundwater Sampling Survey, Fall 1994

B21

MCP Phase II, Risk Assessment Work Plan, Paint Factory Site Wellesley, MA

B22

Interpretive Report of Results for the Groundwater Sampling Survey, Spring 1995

B23

Interpretive Report of Results for the Groundwater Sampling Survey, Fall 1995

B24

Proposed Scope of Work For Conducting Assessment Activities at Wellesley College, Wellesley, MA

B25

Proposed Scope of Work for Conducting Additional Assessment at the Former Henry Woods Paint Factory

B26

Notice of Intent for Proposed Site Assessment Activities at the Former Paint Factory Site

B27

Written Notification and Immediate Response Action Plan, RTN 313767, Alumnae Hall, Wellesley College, Wellesley, MA

B28

Interpretive Report of Results for the Groundwater Sampling Survey, Spring 1996

B29

Compilation of Site Assessment Reports at Wellesley College, Wellesley, MA Volumes I and II

B30

Status Report Additional Assessment at the Former Henry Woods Paint Factory, Wellesley, MA

B31

Proposed Scope of Work, Hydrogeologic Assessment, Former Henry Woods Paint Factory

B32

Proposed Scope of Work, Hydrogeological Assessment, Former Henry Woods Paint Factory )

B33

Approach to Environmental Risk Characterization for Aquatic, Wetland, and Terrestrial Environments Associated with the Paintshop Pond Site

B34

Response Action Outcome Report, East Side Alumnae Hall, Wellesley College

B35

MCP Phase II Comprehensive Human Health Risk Assessment Scope of Work, Former Henry Woods Paint Factory Site (Menzie-Cura & Associates, Inc.)

B36

Approach to Environmental Risk Characterization for Aquatic, Wetland, and Terrestrial Environments Associated with the Paintshop Pond Site

B37

Interpretive Report of Results for the Groundwater Sampling Survey, Fall 1997

B38

MCP Phase II Comprehensive Human Health Risk Assessment Revised Scope of Work, Former Henry Woods Paint Factory Site, Wellesley, MA 02181

B39

Notice of Intent, Implementation of Access Control Measures, Former Paint Factory Site, Wellesley, MA

B40

Draft Workplan, Environmental Risk Characterization, The Paintshop Pond Site

B40a

Fact Sheet on Paintshop Pond issued by Wellesley College Office of Public Affairs

B41

Interpretive Report of Results for the Groundwater Sampling Survey, Fall 1997

B42

Evaluation of Potential Imminent Hazard Conditions in Lake Waban

B43

Literature on Contaminants (Lead, Chromium, Arsenic, etc.)