This file lists the item number and a descriptive title of each of the l documents related to the clean up of the former Henry Wood's Sons Company/Paintshop Pond site to be found in the Science Library. The full Excel spreadsheet also contains the document date, subject category and type.If you have problems downloading the Excel Spreadsheets, please see the Directions for Launching Excel.
All items in this list are available in the Reserve Collection located at the Science Library Circulation Desk. Ask for the "Paintshop Pond Documents" and use the "Item #" in the first column to request the papers that you want to see.
Documents related to Clean-Up of former
Henry Wood's Sons Company Paint Factory/Paintshop
Pond Site
|
Item # |
Title or Description |
|
B1 |
Report of Phase I Sampling and Analysis on the Former Paint Factory Site |
|
B2 |
Report of Phase II Assessment of the Former Henry Wood's Sons |
|
B3 |
Proposed Scope of Work Supplemental Sampling Program and Public Health and Environmental Risk Assessment Paint Factory Site, Wellesley, MA |
|
B4 |
Request for Determination of Applicability, Former Henry Wood's Sons and Company Paint Factory Site |
|
B5 |
A Limited Diagnostic Survey of the Wellesley College Campus to Detect the Potential Presence of Paint Pigments Originating From the Former Paint Factory Site at Paintshop Pond |
|
B6 |
Addendum Report: Phase II Assessment of the Former Henry Wood's Sons and Company Paint Factory Site |
|
B7 |
Proposed Scope of Work Hydrogeologic Assessment East of the Former Henry Wood's Sons Company Paint Factory, Wellesley, MA |
|
B8 |
Request for Determination of Applicability, Former Henry Wood's Sons and Company Paint Factory Site |
|
B9 |
Summary of The Phase I Activities, Wellesley College Campus, Wellesley, MA |
|
B10 |
Interim Measures Plan for the Removal of Source Material at the Former Henry Wood's Sons and Company Paint Factory Site |
|
B10a |
Fact Sheet on Paintshop Pond issued by Wellesley College Office of Public Affairs |
|
B11 |
Contract Documents and Specifications for Source Remediation Activities at the Former Henry Wood's Sons and Company Paint Factory Site , revised September 7, 1991 |
|
B12 |
Supplemental Report to the Phase II Assessment of the Former Henry Wood's Sons and Company Paint Factory Site |
|
B13 |
Paintshop Pond - Addendum to Phase II, DEP Case #3-0462, Response to DEP Comments and Questions |
|
B14 |
Waiver Application Paintshop Pond, Route 135 |
|
B15 |
Scope of Work: Supplemental Environmental Monitoring Program Former Henry Wood's Sons and Company Paint Factory Site, Wellesley, MA |
|
B16 |
Interpretive Report of Results for the Groundwater Sampling Survey, Fall 1994 |
|
B17 |
Strategy Document for the Management of Contaminated Media Former Henry Wood's Sons and Company Paint Factory Site, Wellesley, MA |
|
B18 |
Immediate Response Action Plan, Paint Factory Site, Wellesley, MA |
|
B19 |
Request for Determination of Applicability, Implementation of Access Control Measures, Former Paint Factory Site |
|
B20 |
Interpretive Report of Results for the Groundwater Sampling Survey, Fall 1994 |
|
B21 |
MCP Phase II, Risk Assessment Work Plan, Paint Factory Site Wellesley, MA |
|
B22 |
Interpretive Report of Results for the Groundwater Sampling Survey, Spring 1995 |
|
B23 |
Interpretive Report of Results for the Groundwater Sampling Survey, Fall 1995 |
|
B24 |
Proposed Scope of Work For Conducting Assessment Activities at Wellesley College, Wellesley, MA |
|
B25 |
Proposed Scope of Work for Conducting Additional Assessment at the Former Henry Woods Paint Factory |
|
B26 |
Notice of Intent for Proposed Site Assessment Activities at the Former Paint Factory Site |
|
B27 |
Written Notification and Immediate Response Action Plan, RTN 313767, Alumnae Hall, Wellesley College, Wellesley, MA |
|
B28 |
Interpretive Report of Results for the Groundwater Sampling Survey, Spring 1996 |
|
B29 |
Compilation of Site Assessment Reports at Wellesley College, Wellesley, MA Volumes I and II |
|
B30 |
Status Report Additional Assessment at the Former Henry Woods Paint Factory, Wellesley, MA |
|
B31 |
Proposed Scope of Work, Hydrogeologic Assessment, Former Henry Woods Paint Factory |
|
B32 |
Proposed Scope of Work, Hydrogeological Assessment, Former Henry Woods Paint Factory ) |
|
B33 |
Approach to Environmental Risk Characterization for Aquatic, Wetland, and Terrestrial Environments Associated with the Paintshop Pond Site |
|
B34 |
Response Action Outcome Report, East Side Alumnae Hall, Wellesley College |
|
B35 |
MCP Phase II Comprehensive Human Health Risk Assessment Scope of Work, Former Henry Woods Paint Factory Site (Menzie-Cura & Associates, Inc.) |
|
B36 |
Approach to Environmental Risk Characterization for Aquatic, Wetland, and Terrestrial Environments Associated with the Paintshop Pond Site |
|
B37 |
Interpretive Report of Results for the Groundwater Sampling Survey, Fall 1997 |
|
B38 |
MCP Phase II Comprehensive Human Health Risk Assessment Revised Scope of Work, Former Henry Woods Paint Factory Site, Wellesley, MA 02181 |
|
B39 |
Notice of Intent, Implementation of Access Control Measures, Former Paint Factory Site, Wellesley, MA |
|
B40 |
Draft Workplan, Environmental Risk Characterization, The Paintshop Pond Site |
|
B40a |
Fact Sheet on Paintshop Pond issued by Wellesley College Office of Public Affairs |
|
B41 |
Interpretive Report of Results for the Groundwater Sampling Survey, Fall 1997 |
|
B42 |
Evaluation of Potential Imminent Hazard Conditions in Lake Waban |
|
B43 |
Literature on Contaminants (Lead, Chromium, Arsenic, etc.) |