The planned activities for
the week of 4/29/02 are as follows:
- Continue storm drain work including frames and covers.
- Possibly continue importing borrow.
- Excavation of borrow soil from the softball field area.
- Placement of topsoil layer for surface restoration.
- Continue subgrade and finish grading across site.
- Granite work around PSP dam postponed till week of May 6, 2002.
- Wetlands restoration subcontractor begins installation of erosion
controls and leaf mulch, possibly plantings.
- Installation of monitoring well network is ongoing.
Activities conducted during
the week of 4/22/02 include:
- Continued storm drain installation along the south side of the Distribution
Center building, as well as other site drainage.
- Continued importing borrow.
- Excavation of borrow soil from the softball field area.
- Placement of topsoil layer for surface restoration.
- Continued subgrade and finish grading across site.