The planned activities for the week of 4/29/02 are as follows:

  1. Continue storm drain work including frames and covers.
  2. Possibly continue importing borrow.
  3. Excavation of borrow soil from the softball field area.
  4. Placement of topsoil layer for surface restoration.
  5. Continue subgrade and finish grading across site.
  6. Granite work around PSP dam postponed till week of May 6, 2002.
  7. Wetlands restoration subcontractor begins installation of erosion controls and leaf mulch, possibly plantings.
  8. Installation of monitoring well network is ongoing.

    Activities conducted during the week of 4/22/02 include:
  1. Continued storm drain installation along the south side of the Distribution Center building, as well as other site drainage.
  2. Continued importing borrow.
  3. Excavation of borrow soil from the softball field area.
  4. Placement of topsoil layer for surface restoration.
  5. Continued subgrade and finish grading across site.