The planned
activities for the week of 8/20/2001 are as follows:
- Begin upper Distribution Center parking lot
remediation.
- Tree and vegetation clearing near Paintshop Pond
cofferdam and treatment area for IT staging areas.
- Contaminated and clean peat removal from the Northern
Wetlands, with subsequent backfill with clean
materials.
- Continued stockpiling of clean peat in Borrow Area B
gravel pit (ongoing).
- Begin Paintshop Pond sediment removal, including
installation of miscellaneous sumps.
- Completion of diversion tube.
- Continue construction of consolidation area.
- Ongoing main dewatering sump improvements.
Activities
conducted during the week of 8/13/2001 include:
- Ongoing contaminated stump grinding.
- Conducted remedial excavation and subsequent
installation of diversion tube weir structure; began
excavating for the diversion tube/pipe.
- Installation of sump(s) in Paintshop Pond for
dewatering.
- Continue bulk excavation of clean borrow soils from
Borrow Area A.
- Continue excavating clean and contaminated peat
materials from the Northern Wetland, with subsequent
backfill with clean materials.
- Continued dewatering in Northern Wetland using
miscellaneous sumps.
- Continue constructing the main dewatering sump
velocity dispersion measures and header piping.
- Relocated contaminated soil and debris from the top
of the former tennis court to appropriate on-site areas.
Scraped and stockpiled fill soils observed on top of the
former tennis courts.