The planned activities for
the week of 10/22/2001 are as follows:
- Continue dredging Area NS-4 using the barge to transfer dredge spoils
to shoreline. Dredging will be conducted from the boathouse working
westward.
- Continue dredging in Lake Waban and managing material in uplands decant
area.
- Continue uplands remedial excavation adjacent to the southern wetlands
(e.g., former settling lagoon area).
- Continue uplands remedial excavation adjacent to and downstream of
the Paintshop Pond dam for purposes of installing concrete footings
and wingwalls; uplands remedial excavation in the vicinity of former
paint factory; uplands remedial excavation south of treatment area.
- Continue excavating contaminated Southern Wetland peat (piling and
load-out for placement in the consolidation area).
- Continue grading and compacting contaminated material placed into
the consolidation area.
- Continue concrete work in vicinity of Paintshop Pond dam.
- Continue operation of multi-media and bag filter treatment system
at the main dewatering sump. Change out filter media in remaining two
vessels of the multi-media filter system.
- Treat soil.
- Excavate treated and tested soil
- Continue health and safety air monitoring.
Activities conducted during
the week of 10/15/2001 include:
- Continued dredging in Lake Waban and managing material in uplands
decant area [dredged area
NS-4. Cell C6 was completed, then dredge barge moved to the area of
the boathouse (Cell C14/D14). Dredging conducted from the boathouse
area working westward. Completed dredging D14, C14, and C13.]
- Dredged spoils were loaded into barges for primary dewatering. Barge
is equipped with a sump to dewater dredged spoils prior to transport
to the shoreline. Barges are then transported to shore where material
is excavated from barge loaded into trucks and placed in the uplands.
- Discontinued use of trailing silt curtain based on analytical data
which suggest the trailing silt curtain was recontaminating previously
dredged areas. .
- Continue excavating contaminated Southern Wetland peat (piling for
load-out).
- Poured concrete footing for the southern "training" wall for the Paintshop
Pond dam and wall restoration; stripped concrete form; started steel
reinforcing.
- Completed grading of layer of contaminated peat and a layer of dry
contaminated soil within the consolidation area.
- Continue operation of multi-media and bag filter treatment system
at the main dewatering sump. Change out filter media in two of the four
vessels of the multi-media filter system.
- Moving wet material stockpiled in the uplands for drying into the
consolidation area.
- Grading treated contaminated soil from the IT treatment program within
the consolidation area.
- Treated soil.
- Excavated treated and tested soil
- Continue health and safety air monitoring.