Campus Projects

Various campus projects happen throughout the year, including construction, landscaping, and infra-structural improvements.

 

Upcoming Construction Projects

Project

Building

Description

Target Completion Date

Jewett Foundation Gift: Phase 3

JAC

Cosmetic improvements, part 3 of donor funds.

Summer 2020

Res Hall Improvements: Severance

SEV

Critical deferred maintenance repairs.

Dec 2019

Paulson Initiative

CWI

Campus wide ecology, focusing on water management.

Dec 2019

Masonry Assessment

CWI

Evaluate approximately 30 masonry buildings.

Dec 2019

E2040

CWI

Planning for carbon neutral in 2040.

 

ADA Access

CWI

Residence Hall accessibility, continued development of ADA projects.

Dec 2019

Mechanical Studies

Various

Studies will take place at Jewett, Clapp, KSC Pool, & Davis Museum.

Spring 2020

Energy Use Master Planning

CWI

Master planning for becoming a carbon-neutral campus.

Apr 2020

Res Hall Improvements: Tower Court

TWC

Critical deferred maintenance repairs.

Aug 2020

Res Hall Improvements: Claflin

CLA

Critical deferred maintenance repairs.

Aug 2020

Infrastructure Repairs CWI Electrical switchgears, water line distribution, and other miscellaneous infrastructure deferred maintenance needs. Summer 2019

Central Utility Plant Upgrades

PHY

Upgrades to electrical generation, chillers, and boilers.

Spring 2020

Counseling Upgrades

STO

Upgrade lighting, flooring, and minor space adjustments.

Feb 2020

Labyrinth

 

Rebuild labyrinth in Arboretum area.

Winter 2019 - 2020

Miscellaneous ADA Upgrades CWI Alum Hall door opener, signage at Acad Quad, walkways near Science. Spring 2020
Carillion Repairs and Safety Upgrades GRH Repair screen in Galen Tower and add safety measures to Carillion practice area. Winter 2020
Daycare Fire Sprinkler Upgrades WCCC Replace existing sprinkler heads, must be done on off-hours. TBD
New Office Configuration SCH Reconfigure space for staff growth in Student Financial Services, Floor 1 Schneider. Winter 2020
Energy Conservation Projects CWI Campuswide energy conservation projects such as LED lighting, controls systems, weather-proofing, etc. Summer 2021

 

Active Construction Projects

Project

Building

Description

Target Completion Date

Science Center Renovation

SCI

Sage demo and new construction is underway. L-Wing is complete and re-occupied. Modular trailers have been modified for classrooms and offices.

Sept 2021

Billings: New Elevator and Deferred Maintenance

BIL

Improve accessibility by adding an elevator to Billings Hall. Also address critical deferred maintenance needs.

Feb 2020

Stone Center Accessibility Entrance

STO

Make front entrance door of Stone Center accessible via new ramp and automatic door.

Nov 2019

Upgrade Pool Seating to be ADA Accessible

KSC

Provide wheelchair access and seating, along with companion seating, for viewing competitions.

Nov 2019

Elevator Repairs

Multiple

Elevator repair and maintenance to address modernization. Currently under construction is McAfee and Claflin. Next phrase includes Tower, Stone Davis, and Simpson.

Winter 2019 for current elevators in construction 

Chapel Roof and Stone Repairs

HMC

Repairs to stone gable and slate roof.

Nov 2019

Chapel Repair Stained Glass Window Behind Altar

HMC

Due to buckling and deteriorating, the windows are in urgent need of repair.

Oct 2019

Campus Wide Upgrade of Emergency Generator Phase III/III

CWI

Upgrade emergency generator exhausted for regulatory complaince at Dower, Homestead, Stone Davis, and Weaver.

Fall 2019

Steam Line Repairs

WEA

Emergency repair of steam line.

Fall 2019

 

Recently Completed Construction Projects

Project

Building

Description

Target Completion Date

Global Flora Greenhouse

MFG

Demolition, replacement, and expansion of exisiting permanent greenhouse collection including utility infrastructure and landscape.

Completed

Freeman Hall Improvements

FND

New roof, paint student rooms, and updates to lounges and kitchenettes.

Completed

Pomeroy Hall Improvements

POM

Critical deferred maintenance repairs: new roof, paint students room, and lighting upgrades.

Completed

PERA Track, Turf, and Throwing Areas

CWI

Resurface track, new turf, and new lights.

Completed

Bathroom Upgrades

GRH

Lighting, partitions, and sinks.

Completed

Cheever House Critical Repairs

CHE

Exterior repairs (wood rot, paint, gutters) Improvements to bathrooms for ADA access.

Completed

Lulu Wang Center: Furniture Upgrades

LWC

Replace and repair torn or old furniture.

Completed